The works carried out during the previous weeks (3) have focused on the following:
- Phases 5A and 5B tree pruning.
- Phase 4 grass & leaf raking.
- Phase 4 & 3 pools 4.1, 4.2, 3.1 & 3.2 pruning of hedges and palm trees.
- Phase 5B swimming pools 5.1, 5.2 & 5.3 pruning of hedges and palm trees.
- Collection of leaves from Town Hall & sport areas.
- Pruning and cleaning of HR entrance and El Casón.
- Phase 1 pools 1.1 & 1.2 pruning of hedges and palm trees.
- Raking of gravel on Polaris lines of all phases.
Below is the schedule for this week´s work (week 4).
Week 4 – From 22nd to 27th January 2024
Please note that the schedule of the gardening tasks may be interrupted due to weather (rain, wind, etc.)
Los trabajos realizados durante las semanas anteriores (3) se han centrado en lo siguiente:
- Fase 5A y 5B poda de árboles.
- Fase 4 rastrillado de césped y hojas.
- Fase 4 y 3 piscinas 4.1, 4.2, 3.1 & 3.2 poda de setos y palmeras.
- Fase 5B piscinas 5.1, 5.2 & 5.3 poda de setos y palmeras.
- Recogida de hojas del Ayuntamiento y zonas deportivas.
- Poda y limpieza entrada HR y El Casón.
- Fase 1 piscinas 1.1 y 1.2 poda de setos y palmeras.
- Rastrillado de grava en líneas Polaris de todas las fases.
A continuación se muestra el calendario de trabajo de esta semana (semana 4).
Semana 4 – Del 22 al 27 de enero de 2024
Tenga en cuenta que el calendario de las tareas de jardinería puede verse interrumpido debido a las condiciones meteorológicas (lluvia, viento, etc.)