The works carried out during the previous weeks (21) have focused on the following:
- Phase 1, 2 & 7 grass mowing and leaf collection.
- Phases 3, 4, 5a & 5b pruning of dry shrubs and cleaning of grass areas.
- Phases 7, 6, 5a, 5b & 1 hedge pruning and manual weeding.
- Phases 2, 5a, 5b & 7 pruning of teclium bushes in the front parts.
- Blowing of streets for sweeper lorry in all phases.
- Manual irrigation of new plants.
- Phases 5a & 5b pruning of bougainvilleas.
- Phases 2 & 5a roundabout, teclium pruning and clean up.
- Manual irrigation of the grass at the HR entrance.
- Pruning and cleaning at HR Entrance, El Casón, etc.
- Phases 1 & 2 checking of all general irrigation valve boxes.
Below is the schedule for this week´s work (week 22).
Week 22 – From 27th to 1st June 2024
Please note that the schedule of the gardening tasks may be interrupted due to weather (rain, wind, etc.)
Los trabajos realizados durante las semanas anteriores (21) se han centrado en lo siguiente
- Fases 1, 2 y 7 corte de césped y recogida de hojas.
- Fases 3, 4, 5a & 5b poda de arbustos secos y limpieza de zonas de césped.
- Fases 7, 6, 5a, 5b & 1 poda de setos y desbroce manual.
- Fases 2, 5a, 5b & 7 poda de arbustos de teclium en las partes delanteras.
- Soplado de calles para camión barredor en todas las fases.
- Riego manual de las nuevas plantas.
- Fases 5a & 5b poda de buganvillas.
- Fases 2 y 5a rotonda, poda de teclium y limpieza.
- Riego manual del césped en la entrada del HR.
- Poda y limpieza en entrada HR, El Casón, etc.
- Revisión fases 1 y 2 de todas las arquetas generales de riego.
A continuación se muestra el calendario de trabajo de esta semana (semana 22).
Semana 22 – Del 27 al 1 de junio de 2024
Tenga en cuenta que el horario de las tareas de jardinería puede verse interrumpido por causas meteorológicas (lluvia, viento, etc.)