The works carried out during the previous weeks (14) have focused on the following:

  • Phase 2 & 7 hedge cutting and trimming.
  • Phases 2, 3, 4 & 6 manual weeding.
  • Phase 1 removal of dried palm heart.
  • Phase 1 pool 1.2 palm tree pruning.
  • Blowing of streets for sweeper lorry.
  • Fumigation of palm trees against the red palm weevil at phases 3 & 4, HR entrance, roundabouts, El Casón, boulevard, etc.
  • Manual watering of new plants.
  • Raking of pavement gravel areas in all phases.

Below is the schedule for this week´s work (week 15).

Week 15 – From 8th to 13th April 2024

Please note that the schedule of the gardening tasks may be interrupted due to weather (rain, wind, etc.)

Los trabajos realizados durante las semanas anteriores (14) se han centrado en lo siguiente:

  • Fases 2 y 7 de corte y recorte de setos.
  • Desbroce manual de las fases 2, 3, 4 y 6.
  • Fase 1 retirada de palmito seco.
  • Fase 1 piscina 1.2 poda de palmeras.
  • Soplado de calles para camión barredor.
  • Fumigación de palmeras contra el picudo rojo en fases 3 y 4, entrada HR, rotondas, El Casón, bulevar, etc.
  • Riego manual de nuevas plantas.
  • Rastrillado de las zonas de grava del pavimento en todas las fases.

A continuación se muestra el programa de trabajo de esta semana (semana 15).

Semana 15 – Del 8 al 13 de abril de 2024

Tenga en cuenta que el horario de las tareas de jardinería puede verse interrumpido por causas meteorológicas (lluvia, viento, etc.)

Categories: 2024