The works carried out during the previous weeks (22) have focused on the following:

  • Phase 1 swimming pool 1.1 &1.2 cleaning of planters.
  • Phase 7 spraying of hedges against cochineal mealybug.
  • Phase 1, 3, 4, 5a & 5b blowing of leaves for sweeper lorry.
  • Phase 1, 2 & 7 dry shrub pruning and clean up.
  • Phase 6 & 7 grass mowing and leaf collection.
  • Phase 5B & 7 cleaning of pitas/agave and removal.
  • Gravel raking in all phases.
  • Maintenance of irrigation systems

Below is the schedule for this week´s work (week 23).

Week 23 – From 3rd to 8th June 2024

Please note that the schedule of the gardening tasks may be interrupted due to weather (rain, wind, etc.)

 

Los trabajos realizados durante las semanas anteriores (22) se han centrado en lo siguiente:

  • Fase 1 piscina 1.1 &1.2 limpieza de jardineras.
  • Fase 7 fumigación de setos contra la cochinilla.
  • Fase 1, 3, 4, 5a & 5b soplado de hojas para camión barredora.
  • Fases 1, 2 y 7 poda y limpieza de arbustos secos.
  • Fases 6 y 7 corte de hierba y recogida de hojas.
  • Fase 5B & 7 limpieza de pitas/agave y retirada.
  • Rastrillado de grava en todas las fases.
  • Mantenimiento de los sistemas de riego.

A continuación se muestra el calendario de trabajo de esta semana (semana 23).

Semana 23 – Del 3 al 8 de junio de 2024

Tenga en cuenta que el horario de las tareas de jardinería puede verse interrumpido debido a las condiciones meteorológicas (lluvia, viento, etc.)

 