The works carried out during the previous weeks (15) have focused on the following:
- Cleaning of workers campound.
- Phase 2 cutting and cleaning of hedges.
- Phases 5a and 5b spraying of palm trees against red palm weevil.
- Manual weeding in Town Hall areas of Phases 1, 2, 4, 5a & 5b.
- Manual grass watering.
- Phases 3, 5 & 1 blowing of street for sweeper lorry.
- Grass cutting and cleaning at HR entrance, El Casón, El Palomar, etc.
- Raking of pavement gravel areas in all phases.
Below is the schedule for this week´s work (week 16).
Week 16 – From 15th to 20th April 2024
Please note that the schedule of the gardening tasks may be interrupted due to weather (rain, wind, etc.)
Los trabajos realizados durante las semanas anteriores (15) se han centrado en lo siguiente:
- Limpieza del camping de los trabajadores.
- Fase 2 corte y limpieza de setos.
- Fases 5a y 5b fumigación de palmeras contra el picudo rojo.
- Desbroce manual en las zonas del Ayuntamiento de las Fases 1, 2, 4, 5a y 5b.
- Riego manual del césped.
- Soplado de las calles de las Fases 3, 5 y 1 para el camión barredor.
- Corte de césped y limpieza en entrada HR, El Casón, El Palomar, etc.
- Rastrillado de zonas de grava del pavimento en todas las fases.
A continuación se muestra el calendario de trabajo de esta semana (semana 16).
Semana 16 – Del 15 al 20 de abril de 2024
Tenga en cuenta que el horario de las tareas de jardinería puede verse interrumpido por causas meteorológicas (lluvia, viento, etc.)