The works carried out during the previous weeks (11) have focused on the following:

  • Street blowing for sweeper lorry.
  • Phases 3 & 4 cutting and cleaning of hedges.
  • Phases 1 & 7 general reparation of wiring in irrigation chambers.
  • General inspections of irrigation throughout the Resort.
  • Phase 4 Town Hall areas pruning of trees.
  • Phases 1, 5a, 5b & 7 manual weeding.
  • Phases 5a & 5b cover tarpaulin in gravel areas.
  • Phase 5b swimming pool, pruning of interior palm trees.
  • Pruning and maintenance of HR entrance and El Casón.
  • Raking of gravel in Polaris lines of all phases.

Below is the schedule for this week´s work (week 12).

Week 12 – From 18 to 23rd March 2024

Please note that the schedule of the gardening tasks may be interrupted due to weather (rain, wind, etc.)

Los trabajos realizados durante las semanas anteriores (11) se han centrado en lo siguiente:

  • Soplado de calles para el camión barredor.
  • Fases 3 y 4 corte y limpieza de setos.
  • Fases 1 y 7 reparación general de cableado en cámaras de riego.
  • Inspecciones generales de riego en todo el Resort.
  • Fase 4 poda de árboles en zonas del Ayuntamiento.
  • Fases 1, 5a, 5b y 7 desbroce manual.
  • Fases 5a y 5b cubrir lona en zonas de grava.
  • Fase 5b piscina, poda de palmeras interiores.
  • Poda y mantenimiento entrada HR y El Casón.
  • Rastrillado de grava en líneas Polaris de todas las fases.

A continuación se muestra el calendario de trabajo de esta semana (semana 12).

Semana 12 – Del 18 al 23 de marzo de 2024

Tenga en cuenta que el horario de las tareas de jardinería puede verse interrumpido por causas meteorológicas (lluvia, viento, etc.)

Categories: 2024