The works carried out during the previous weeks (10) have focused on the following:

  • General maintenance work of the irrigation system.
  • Phase 2, pruning of pine trees and trees in Town Hall areas.
  • Town Hall areas, pruning olive and cypress trees.
  • Phase 5b, cleaning and manual weeding in the picnic area.
  • Manual weeding in Polaris lines in all phases.
  • Fumigation of weeds.
  • Manual watering of olive and cypress trees.
  • Various pruning and cleaning in El Casón.
  • Raking of gravel in Polaris lines of all phases.

Below is the schedule for this week´s work (week 11).

Week 11 – From 11th to 16th March 2024

Please note that the schedule of the gardening tasks may be interrupted due to weather (rain, wind, etc.)

Los trabajos realizados durante las semanas anteriores (10) se han centrado en lo siguiente

  • Trabajos de mantenimiento general del sistema de riego.
  • Fase 2, poda de pinos y árboles en zonas del Ayuntamiento.
  • Fase 3. Zonas del Ayuntamiento, poda de olivos y cipreses.
  • Fase 5b, limpieza y desbroce manual en el merendero.
  • Desbroce manual en líneas de Polaris en todas las fases.
  • Fumigación de malas hierbas.
  • Riego manual de olivos y cipreses.
  • Podas varias y limpieza en El Casón.
  • Rastrillado de grava en líneas Polaris de todas las fases.

A continuación se detalla el programa de trabajo de esta semana (semana 11).

Semana 11 – Del 11 al 16 de marzo de 2024

Tenga en cuenta que el horario de las tareas de jardinería puede verse interrumpido por causas meteorológicas (lluvia, viento, etc.)

Categories: 2024