The works carried out during the previous weeks (9) have focused on the following:

  • Phase 7 pruning of parkinsonias and tipuanas trees.
  • Phase 1 & 2 leaf collection and cleaning of the lawn.
  • Phase 7 pool 7.1, pruning of gauras.
  • Phase 7 pool 7.3 filling gaps in the lawn.
  • Phase 7 pool 7.2 remove bushes in the hedge.
  • Phase 2 pool 2.1, cover gravel mesh.
  • Watering of new plants at HR entrance, information point and El Cason.
  • Cleaning of workers compound.
  • Revision of irrigation pipes.
  • Raking of gravel on Polaris lines of all phases.

Below is the schedule for this week´s work (week 10).

Week 10 – From 4th to 9th March 2024 

Please note that the schedule of the gardening tasks may be interrupted due to weather (rain, wind, etc.)

Los trabajos realizados durante las semanas anteriores (9) se han centrado en lo siguiente:

  • Fase 7 poda de parkinsonias y tipuanas.
  • Fase 1 y 2 recogida de hojas y limpieza del césped.
  • Fase 7 piscina 7.1, poda de gauras.
  • Fase 7 piscina 7.3 rellenar huecos en el césped.
  • Fase 7 piscina 7.2 eliminación de arbustos en el seto.
  • Fase 2 piscina 2.1, cubrir malla de grava.
  • Riego de nuevas plantas en entrada HR, punto de información y El Casón.
  • Limpieza del recinto de trabajadores.
  • Revisión de tuberías de riego.
  • Rastrillado de grava en líneas Polaris de todas las fases.

A continuación se muestra el calendario de trabajo de esta semana (semana 10).

Semana 10 – Del 4 al 9 de marzo de 2024

Tenga en cuenta que el calendario de las tareas de jardinería puede verse interrumpido debido a las condiciones meteorológicas (lluvia, viento, etc.)

Categories: 2024