The works carried out during the previous weeks (6) have focused on the following:
- Manual weeding and collection of dry leaves from Sports area.
- Phase 3, 5A, 5B & 6 manual weeding.
- Phase 6 tree pruning.
- Phase 5 pruning of trees attached to the façade.
- Collection of pruning from workers campound.
- Phase 2 tree pruning.
- Entrance and El Casón pruning, cleaning, watering of new plants, etc.
Below is the schedule for this week´s work (week 7).
Week 7 – From 12th to 17th February 2024
Please note that the schedule of the gardening tasks may be interrupted due to weather (rain, wind, etc.)
Español
Los trabajos realizados durante las semanas anteriores (6) se han centrado en lo siguiente:
- Desbroce manual y recogida de hojas secas de la zona Deportiva.
- Desbroce manual de las fases 3, 5A, 5B y 6.
- Fase 6 poda de árboles.
- Fase 5 poda de árboles adosados a la fachada.
- Recogida de la poda en el campamento de los trabajadores.
Fase 2 poda de árboles. - Poda de entrada y El Casón, limpieza, riego de nuevas plantas, etc.
A continuación se muestra el programa de trabajo de esta semana (semana 7).
Semana 7 – Del 12 al 17 de febrero de 2024
Tenga en cuenta que el horario de las tareas de jardinería puede verse interrumpido debido a las condiciones meteorológicas (lluvia, viento, etc.)