The works carried out during the previous weeks (4) have focused on the following:

  • Phases 6 & 7 tile blowing for sweeper truck.
  • Phases 5 & 1 tree pruning.
  • Phases 1, 2, 7 & 6 pruning of teclium in pools 1-3, 2-1, 2-2, 2-3, 7-1, 7-2, 7-3, 7-4, 6-1 & 6-2.
  • Manual weeding of roundabouts in Phases 1, 2 & 5.
  • Phase 5, nassella pruning.
  • Pruning and cleaning of HR entrance and El Casón.
  • Raking of gravel on Polaris lines in all phases.

Below is the schedule for this week´s work (week 5).

Week 5 – From 29th January to 3rd February 2024

Please note that the schedule of the gardening tasks may be interrupted due to weather (rain, wind, etc.)

Los trabajos realizados durante las semanas anteriores (4) se han centrado en lo siguiente:

Fases 6 y 7 soplado de baldosas para el camión barredora.

Fases 5 y 1 poda de árboles.
Fases 1, 2, 7 & 6 poda de teclium en estanques 1-3, 2-1, 2-2, 2-3, 7-1, 7-2, 7-3, 7-4, 6-1 & 6-2.
Desherbado manual de rotondas en Fases 1, 2 & 5.
Fase 5, poda de nassella.
Poda y limpieza entrada HR y El Casón.
Rastrillado de grava en líneas Polaris en todas las fases.

A continuación se muestra el calendario de trabajo de esta semana (semana 5).

Semana 5 – Del 29 de enero al 3 de febrero de 2024

Tenga en cuenta que el calendario de las tareas de jardinería puede verse interrumpido debido a las condiciones meteorológicas (lluvia, viento, etc.)