The works carried out during the previous week (32) have focused on the following:

  • Phases 2, 3, 4, 5A, 5B & 7, manual weeding.
  • Phase 1, fumigation against cochineal.
  • Manual watering in El Casón, olive trees, and information office.
  • Phase 3, pruning of lower branches.
  • All Phases blowing of streets and pathways for sweeper truck.
  • Phases 7, 2 & 5B, pruning of borgainvillea.
  • Resolving irrigation issues.
  • Raking of gravel in all phases.

Below is the schedule for this week´s work (week 33).

Week 33 – From 12th to 17th August 2024

IMPORTANT INFORMATION

Due to the heat protocol that STV workers are subject to, some activities may be paused or cancelled due to the high temperatures expected this week. Likewise, some activities planned for this week, such as grass cutting, will be carried out as carefully as possible. The dryness of the terrain causes dust to be generated during the activity.

Los trabajos realizados durante la semana anterior (32) se han centrado en lo siguiente:

  • Fases 2, 3, 4, 5A, 5B y 7, deshierbe manual.
  • Fase 1, fumigación contra la cochinilla.
  • Riego manual en El Casón, olivos y quiosco de información.
  • Fase 3, poda de ramas bajeras de árboles.
  • Todas las fases, soplado de calles para el camión barredora.
  • Fases 7, 2 y 5B, poda de buganvillas.
  • Resolución de problemas de riego.
  • Rastrillado de grava en todas las fases.

A continuación se muestra el calendario de trabajo de esta semana (semana 33).

Semana 33 – Del 12 al 17 de agosto 2024

AVISO IMPORTANTE

Debido al protocolo de calor al que están sometidos los trabajadores de STV, algunas actividades pueden ser pausadas o canceladas debido a las altas temperaturas que se esperan esta semana. Asimismo, algunas actividades previstas para esta semana, como el corte de césped, se llevarán a cabo con el mayor cuidado posible. La sequedad del terreno hace que se genere polvo durante la actividad.

Categories: 2024