The works carried out during the previous week (24) have focused on the following:

  • Street blowing for sweeper lorry in all phases.
  • Phases 1, 5a, 5b & 6 manual watering of palm trees in pool areas.
  • Phase 2 & 4 grass mowing and leaf collection.
  • Phases 3, 5a & 5b pruning and cleaning of hedges.
  • Phases 1, 5a, 5b & 7 pruning of shrubs on the fence wall of the Town Hall.
  • Cleaning of campound area.
  • Phase 2 pruning of oleanders and cleaning.
  • Manual weeding in the Boulevard.
  • Phases 3, 4, 5a & 5b jet washing areas affected by the rainfall.
  • Mowing and shaping of grass on the driving range, El Cason, playground equipment, etc.
  • Clearing of dirt in affected areas after rainfall.

Below is the schedule for this week´s work (week 25).

Week 25 – From 17th to 22nd June 2024

Please note that the schedule of the gardening tasks may be interrupted due to weather (rain, wind, etc.)

 

Los trabajos realizados durante la semana anterior (24) se han centrado en lo siguiente:

  • Soplado de calles para camión barredora en todas las fases.
  • Fases 1, 5a, 5b & 6 riego manual de palmeras en zonas de piscinas.
  • Fases 2 y 4 corte de césped y recogida de hojas.
  • Fases 3, 5a & 5b poda y limpieza de setos.
  • Fases 1, 5a, 5b & 7 poda de arbustos en el muro de la valla del Ayuntamiento.
  • Limpieza de la zona de acampada.
  • Fase 2 poda de adelfas y limpieza.
  • Desbroce manual en el Boulevard.
  • Fases 3, 4, 5a y 5b lavado a chorro de zonas afectadas por las lluvias.
  • Corte y perfilado de césped en el campo de prácticas, El Casón, juegos infantiles, etc.
  • Desbroce de la suciedad en las zonas afectadas tras las lluvias.

A continuación se muestra el calendario de trabajo de esta semana (semana 25).

Semana 25 – Del 17 al 22 de junio de 2024

Tenga en cuenta que el calendario de las tareas de jardinería puede verse interrumpido debido a las condiciones meteorológicas (lluvia, viento, etc.)